Alternatively your attic may already have some sort of floor but this doesn t.
Unfinished attic joist.
Most attics will need a sub floor to be laid that you can build on top of.
The only storage system designed specifically for the unfinished areas over a garage or under a roof.
How to strengthen floor joists before finishing an attic attics that have no flooring.
Attic flooring panels are easy to install with their interlocking edges.
In unfinished attic spaces insulate between and over the floor joists to seal off living spaces below.
The safest way to move around an unfinished attic is to create a catwalk or walking platform by attaching some 1x6 or 1x8 boards or strips of 3 4 plywood to the joists with screws don t use nails because the hammering might disturb the drywall or plaster ceiling below.
1a attic access door 2.
Unless expressly built so an attic s joists are meant for carrying the load of the.
Cut sub floor panels to the appropriate size and install them over the joist beams.
Attics with existing flooring.
Lay a sub floor if necessary.
The type of modifications selected for reinforcing the joists will depend on the recommendations of the engineer but the following methods are commonly used to beef up undersized attic joists.
If the air distribution is in the attic space then consider insulating the rafters to move the distribution into the conditioned space.
These lightweight easy to manage panels can be installed by even the most inexperienced homeowner in about 15 minutes.