A typical interior roof drain assembly occupies about a 4 by 4 square area with a per foot tapered slope.
Sumped roof drains with insulation.
The membrane is cut out at each drain and is secured by the drains clamping collar.
So it is possible that the roof drain can be.
Sumped roof drain with parapro flashing.
Send us your specs and plans.
If a roof drain is installed flush with a roofing system the drain ring itself will create a pond due.
The threaded extension is placed on the structural deck level to accommodate various thickness of insulation thereby avoiding the necessity of tapering or feathering the insulation layer down to the fixed body flange level of the drain causing a loss of insulation value at the drain location.
Sumped roof drain with parapro paraflex 531 liquid flashing.
Sometimes there is only a generic drain detail and the insulation drain height is not known until the tapered insulation drawings are done by the roof insulation manufacturer and approved by the architect.
Paraguard roof drain with parasolo flashing.
Superior roof drain sump pans for the construction industry.
Coated metal overflow scupper.
Coated metal roof edge.
Drain with inter ply parasolo flashing.
The dimensionally stable gemini dst provides a positive 4 way slope to the roof drain.
The roof drain is usually set in the deck and the membrane is stretched over the entire roof.
Near drains are flush with roof and far drains are sumped 1.
Roof drain pans company 888 900 9145 949 317 0251.
Well the answer is quite simple.
4 x4 1220mm x 1220mm.
Epdm roofs are water proof and tend to be expensive.
Available with acfoam ii acfoam iii and facer technology one piece pre fabricated tapered panel.
A rubber roof is just that a rubber membrane is placed over insulation panels which are fastened to the deck.
Paraguard m raised edge system.
A typical interior roof drain assembly occupies about a 4 foot by 4 foot square area with a inch per foot tapered slope.
Now you may wonder how that could produce such large ponding water areas on a roof with tapered insulation.
Parapro 123 flashing system fully adhere wipe w pro prep before lapping subsequent sheets paradiene 20 fully adhere to substrate set in sft cement 6 around drain perimeter rigid insulation slope to drain paradiene 30 fr fully adhere paradiene 20 see note 1 fully adhere 3 3 structural substrate.
If the insulation reaches 3 or thicker an 8 by 8 creates a more gradual slope while still providing the necessary momentum.
Never let water begin to pond.
Coated metal roof edge joint treatment.
But this in most cases is done well before the drains are installed and probably purchased.
According to nrca drains should be located in square shaped gradually tapered sumps formed in the insulation to facilitate localized drainage at drains.
As a general rule if the insulation is 2 thick or less a 4 by 4 is sufficient.