For a metal or steel deck floor system you need to have 2 layers ie one for the metal deck and one for the concrete topping.
Steel flooring concrete slab on metal deck detail.
The standard gray primer is applied to the underside of the steel deck as compared to both sides for roof deck leaving the top side bare for concrete adhesion.
A composite floor is comprised of a reinforced concrete floor slab and structural steel floor beams acting compositely together.
Concrete cast on metal deck or composite deck is one of the most effective ways to build concrete floors.
For this instance select structural deck 1.
Usually when this happens the structure is steel frame.
Reinforced concrete slab systems on steel decks decking can serve as form shoring and.
Cad dwg drawing for a steel decking concrete floor detail.
Metal roof decking is the common roof type.
This brings up the structural deck properties option below.
Majority of commercial buildings that are two or more stories are built with concrete floor deck or concrete poured on top of steel deck.
Slab over the supports will pre ve n t the formation of tension cracks due to flexure when slabs are continu ous for two or more spans.
The formation of light rust on the top side of the deck prior to concrete placement is common and does not adversely impact the deck or composite deck slab assembly.
Composite steel floor deck has a ribbed profile with embossments designed to interlock with concrete slabs creating a reinforced concrete slab that serves the dual purpose of a permanent form and positive reinforcement.
On the function column to the left you can select from the drop down the appropriate category.